Facitlies

  • Oven size 1700mm (W) x 2100mm (H) x 3900mm (L) 6’x7’x13’ 1 No
  • Conveyorised Back to back booth. 1 No
  • Pretreatment tank size1050mm (W) x 1250mm (H) x 2500mm (L) 8 Nos

Metal Pretreatment System

  • Our metal pretreatment system is eight tank zinc phosphating system. The time duration is based on room temperature.

    Tank-1 : Alkaline base degreaser

    Metal cleaning is the essential process for the surface finish. Metal cleaning here is removal of grease, oil, soil, lubricating, oxide films etc.

    Timing : 10 to 15 minutes.


    Tank – 2 : Water rinsing

    Tank – 3 : Phosphoric (h5PO4) acid base Deruster.

    This process removes rust, scale, loose oil, carbonates etc.
    Timing : 15 to 20 minutes.


    Tank – 4 : Water rinsing

    Tank – 5 : Titanium base Activator/ Modifier.

    This process allows the development of compact crystal structure on metal surface for excellent phosphate coating and reduces phosphating time.

    Timing : 1minute.


    Tank – 6 : Zinc Phosphating.

    Zinc phosphate protects the metal surface from corrosion. It also gives superior bonding to the metal surface thus enhancing the durability and life of paints & powder coats.

    Confirming to class ‘C’ IS : 3618.

    Timing : 15 to 20 minutes.


    Tank – 7 : Water rinsing.

    Tank – 8 : Non Chrome Liquid Passivation.

    Passivation treatment seals phosphate surface.

    Timing : 1 minute.